شاركنا تاريخ ميلادك!
تاريخ الميلاد
تاريخ الميلاد المدخل غير مكتمل يرجى ادخال تاريخ ميلاد صحيح
×
Budget and Spending: Status of the Trident Submarine and Missile Programs: Psad-77-34 by U. S. Government Accountability Office ( - Paperback
76.65 درهم

Budget and Spending: Status of the Trident Submarine and Missile Programs: Psad-77-34 by U. S. Government Accountability Office ( - Paperback

كن أول من يقيِّم هذا المنتج 

76.65 درهم 

  - ستوفر -76.66 درهم
الأسعار تشمل ضريبة القيمة المضافة  التفاصيل
مشمولة في الشحن مجاني على طلبات أكثر من 100.00 درهم التفاصيل
رقم ال ISBN
9781287195115
الفئات
سياسة
الكاتب
U. S. Government Accountability Office (
الناشر
Bibliogov
الوصف:

A review of the Trident Submarine and Missile program's cost, schedule and technical performance was conducted. A particular concern was to determine whether the submarine and missile will be operational in September 1979, as planned. Navy and contractor officials were interviewed, and records provided by the officials were reviewed. The Trident submarine will be the successor to the ...

تشحن من الولايات المتحدة
اشحن الى دبي (تغيير المدينة)
التوصيل خلال الأحد ١٥ يوليو - الإثنين ١٦ يوليو الي دبي

حالة السلعة:
جديدة
البائع:
InternationalBookStore (88% تقييم ايجابي)

معلومات المنتج

  •  

    المواصفات

    رقم ال ISBN
    9781287195115
    الفئات
    سياسة
    الرقم المميز للسلعة
    2724352634895
    المؤلفين
    الكاتب
    U. S. Government Accountability Office (
    المؤلفين
    الناشر
    Bibliogov
    رقم ال ISBN
    9781287195115
    الفئات
    سياسة
    الرقم المميز للسلعة
    2724352634895
    المؤلفين
    الكاتب
    U. S. Government Accountability Office (
    المؤلفين
    الناشر
    Bibliogov
    معلومات تقنية
    غلاف الكتاب
    غلاف عادي
    اللغات والبلدان
    لغة الكتاب
    الانجليزية
    إقرأ المزيد
  •  

    الوصف:

    A review of the Trident Submarine and Missile program's cost, schedule and technical performance was conducted. A particular concern was to determine whether the submarine and missile will be operational in September 1979, as planned. Navy and contractor officials were interviewed, and records

    A review of the Trident Submarine and Missile program's cost, schedule and technical performance was conducted. A particular concern was to determine whether the submarine and missile will be operational in September 1979, as planned. Navy and contractor officials were interviewed, and records provided by the officials were reviewed. The Trident submarine will be the successor to the Polaris/Poseidon ballistic missile fleet. At the time of GAO's review, the Navy was reporting an estimated cost of $18.8 billion for an 11-ship program. As of December 31, 1976, the Navy reported a 13-ship program at a cost of $21.4 billion. The planning documents called for 16 Trident submarines. Costs estimated to be about $12 billion are not included in the total program costs. This includes the costs for five ships beyond the 11 included in the Selected Acquisition Report, backfit of the Poseidon submarines, propulsion plant and warhead, construction, and other items which, if included, could bring the total program costs to over $30 billion. The Trident deployment date has been postponed 5 months because of delays in submarine construction. The missile developmental flight test program is on a very tight schedule with little margin to absorb any additional delays. Should any new problems or further delays develop, it could affect the entire test program.

    خصائص المنتج:
    • الفئات: سياسة
    • غلاف الكتاب: غلاف عادي
    • لغة الكتاب: الانجليزية
    • الكاتب: U. S. Government Accountability Office (
    • الناشر: Bibliogov
    • رقم ال ISBN: 9781287195115
    • عدد الصفحات: 32
    • لأبعاد (الارتفاع*العرض*العمق): 9.69 x 7.44 x 0.07 inches
 

تقييمات المستخدمين

0
لا يوجد تقييمات بعد
كن أول من يقيِّم هذا المنتج
قيِّم هذا المنتج:

إعلانات مُموَّلة لك

×

الرجاء تأكيد رقم هاتفك الجوال لإكمال عملية الشراء

سنقوم بإرسال رسالة نصية تحتوي على رمز التفعيل، الرجاء التأكد من رقم هاتفك الجوال ادناه، ثم انقر على زر "أرسل رمز التفعيل".