شاركنا تاريخ ميلادك!
تاريخ الميلاد
تاريخ الميلاد المدخل غير مكتمل يرجى ادخال تاريخ ميلاد صحيح
×
Bureau of Reclamation: Central Valley Project Cost Allocation Overdue and New Method Needed: Rced-92-74 by U. S. Government Accountability Office ( - Paperback
60.90 درهم

Bureau of Reclamation: Central Valley Project Cost Allocation Overdue and New Method Needed: Rced-92-74 by U. S. Government Accountability Office ( - Paperback

كن أول من يقيِّم هذا المنتج 

60.90 درهم 

  - ستوفر -60.90 درهم
الأسعار تشمل ضريبة القيمة المضافة  التفاصيل
رقم ال ISBN
9781287171836
الفئات
سياسة
الكاتب
U. S. Government Accountability Office (
الناشر
Bibliogov
الوصف:

Pursuant to a congressional request, GAO reviewed how the Bureau of Reclamation allocates construction costs for the Central Valley Project (CVP), the Bureau's largest water resource project. GAO found that: (1) the Bureau gave limited attention to the congressional mandate to implement an updated cost allocation study by January 1988, mainly because of funding and staffing constraints; (2) ...

تشحن من الولايات المتحدة
اشحن الى دبي (تغيير المدينة)
التوصيل خلال الأحد ٦ مايو - الثلاثاء ٨ مايو الي دبي

حالة السلعة:
جديدة
البائع:
InternationalBookStore (88% تقييم ايجابي)

معلومات المنتج

  •  

    المواصفات

    رقم ال ISBN
    9781287171836
    الفئات
    سياسة
    الرقم المميز للسلعة
    2724352565663
    المؤلفين
    الكاتب
    U. S. Government Accountability Office (
    المؤلفين
    الناشر
    Bibliogov
    رقم ال ISBN
    9781287171836
    الفئات
    سياسة
    الرقم المميز للسلعة
    2724352565663
    المؤلفين
    الكاتب
    U. S. Government Accountability Office (
    المؤلفين
    الناشر
    Bibliogov
    معلومات تقنية
    غلاف الكتاب
    غلاف عادي
    اللغات والبلدان
    لغة الكتاب
    الانجليزية
    إقرأ المزيد
  •  

    الوصف:

    Pursuant to a congressional request, GAO reviewed how the Bureau of Reclamation allocates construction costs for the Central Valley Project (CVP), the Bureau's largest water resource project. GAO found that: (1) the Bureau gave limited attention to the congressional mandate to implement an updated

    Pursuant to a congressional request, GAO reviewed how the Bureau of Reclamation allocates construction costs for the Central Valley Project (CVP), the Bureau's largest water resource project. GAO found that: (1) the Bureau gave limited attention to the congressional mandate to implement an updated cost allocation study by January 1988, mainly because of funding and staffing constraints; (2) the Bureau included inappropriate costs and made questionable estimates of project benefits and alternative costs in its 1988 draft study, and public comments on the study cited similar concerns; (3) the Bureau charges rates to its CVP water users that are based on the cost allocation percentages it developed in 1970 and updated in 1975; (4) delays in properly allocating CVP costs could result in the government recouping less of its capital investment, because the value of the dollar received years later will be less than if those dollars were timely received; and (5) although the Bureau has agreed to explore alternate allocation approaches it continues to rely on its methodologies, which could cause additional delay in developing an acceptable cost allocation.

    خصائص المنتج:
    • الفئات: سياسة
    • غلاف الكتاب: غلاف عادي
    • لغة الكتاب: الانجليزية
    • الكاتب: U. S. Government Accountability Office (
    • الناشر: Bibliogov
    • رقم ال ISBN: 9781287171836
    • عدد الصفحات: 30
    • لأبعاد (الارتفاع*العرض*العمق): 9.69 x 7.44 x 0.06 inches
 

تقييمات المستخدمين

0
لا يوجد تقييمات بعد
كن أول من يقيِّم هذا المنتج
قيِّم هذا المنتج:

إعلانات مُموَّلة لك

×

الرجاء تأكيد رقم هاتفك الجوال لإكمال عملية الشراء

سنقوم بإرسال رسالة نصية تحتوي على رمز التفعيل، الرجاء التأكد من رقم هاتفك الجوال ادناه، ثم انقر على زر "أرسل رمز التفعيل".