شاركنا تاريخ ميلادك!
تاريخ الميلاد
تاريخ الميلاد المدخل غير مكتمل يرجى ادخال تاريخ ميلاد صحيح
×
Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress by Congressional Research Service - Paperback
87.15 درهم

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress by Congressional Research Service - Paperback

كن أول من يقيِّم هذا المنتج 

87.15 درهم 

  - ستوفر -87.15 درهم
الأسعار تشمل ضريبة القيمة المضافة  التفاصيل
رقم ال ISBN
9781505903805
الفئات
المراجع
الكاتب
Congressional Research Service
الناشر
Createspace
الوصف:

The Navy's proposed FY2015 budget requests funding for the procurement of seven new battle force ships (i.e., ships that count against the Navy's goal for achieving and maintaining a fleet of 306 ships). The seven ships include two Virginia-class attack submarines, two DDG-51 class Aegis destroyers, and three Littoral Combat Ships (LCSs). The Navy's proposed FY2015-FY2019 five-year ...

تشحن من الولايات المتحدة
اشحن الى دبي (تغيير المدينة)
التوصيل خلال الأربعاء ٣١ أكتوبر - الجمعة ٢ نوفمبر الي دبي

حالة السلعة:
جديدة
البائع:
InternationalBookStore (85% تقييم ايجابي)

معلومات المنتج

  •  

    المواصفات

    رقم ال ISBN
    9781505903805
    الفئات
    المراجع
    اللغات
    الانجليزية
    الرقم المميز للسلعة
    2724433782392
    المؤلفين
    الكاتب
    Congressional Research Service
    رقم ال ISBN
    9781505903805
    الفئات
    المراجع
    اللغات
    الانجليزية
    الرقم المميز للسلعة
    2724433782392
    المؤلفين
    الكاتب
    Congressional Research Service
    المؤلفين
    الناشر
    Createspace
    معلومات تقنية
    غلاف الكتاب
    غلاف عادي
    اللغات والبلدان
    لغة الكتاب
    الانجليزية
    إقرأ المزيد
  •  

    الوصف:

    The Navy's proposed FY2015 budget requests funding for the procurement of seven new battle force ships (i.e., ships that count against the Navy's goal for achieving and maintaining a fleet of 306 ships). The seven ships include two Virginia-class attack submarines, two DDG-51 class Aegis

    The Navy's proposed FY2015 budget requests funding for the procurement of seven new battle force ships (i.e., ships that count against the Navy's goal for achieving and maintaining a fleet of 306 ships). The seven ships include two Virginia-class attack submarines, two DDG-51 class Aegis destroyers, and three Littoral Combat Ships (LCSs). The Navy's proposed FY2015-FY2019 five-year shipbuilding plan includes a total of 44 ships, compared to a total of 41 ships in the FY2014-FY2018 five-year shipbuilding plan. The planned size of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy's shipbuilding plans have been matters of concern for the congressional defense committees for the past several years. The Navy's FY2015 30-year (FY2015-FY2044) shipbuilding plan, like many previous Navy 30-year shipbuilding plans, does not include enough ships to fully support all elements of the Navy's 306-ship goal over the entire 30-year period. In particular, the Navy projects that the fleet would experience a shortfall in amphibious ships from FY2015 through FY2017, a shortfall in small surface combatants from FY2015 through FY2027, and a shortfall in attack submarines from FY2025 through FY2034. The Navy delivered its narrative report on the FY2015 30-year shipbuilding plan to CRS on July 3, 2014. The Navy estimates in the report that the plan would cost an average of about $16.7 billion per year in constant FY2014 dollars to implement, including an average of about $15.7 billion per year during the first 10 years of the plan, an average of about $19.7 billion per year during the middle 10 years of the plan, and an average of about $14.6 billion per year during the final 10 years of the plan. A December 2014 Congressional Budget Office (CBO) report on the Navy's FY2015 30-year shipbuilding plan estimates that the plan will require about 13% more funding to implement than the Navy estimates, including about 6% more than the Navy estimates during the first 10 years of the plan, about 14% more than the Navy estimates during the middle 10 years of the plan, and about 20% more than the Navy estimates during the final 10 years of the plan. Over the years, CBO's estimates of the cost to implement the Navy's 30-year shipbuilding plan have generally been higher than the Navy's estimates. Some of the difference between CBO's estimates and the Navy's estimates, particularly in the latter years of the plan, is due to a difference between CBO and the Navy in how to treat inflation in Navy shipbuilding. The program that contributes the most to the difference between the CBO and Navy estimates of the cost of the 30-year plan is a future destroyer that appears in the latter years of the 30-year plan.

    خصائص المنتج:
    • الفئات: المراجع
    • غلاف الكتاب: غلاف عادي
    • لغة الكتاب: الانجليزية
    • الكاتب: Congressional Research Service
    • الناشر: Createspace
    • رقم ال ISBN: 9781505903805
    • عدد الصفحات: 70
    • لأبعاد (الارتفاع*العرض*العمق): 11 x 8.5 x 0.15 inches
 

تقييمات المستخدمين

0
لا يوجد تقييمات بعد
كن أول من يقيِّم هذا المنتج
قيِّم هذا المنتج:

إعلانات مُموَّلة لك

×

الرجاء تأكيد رقم هاتفك الجوال لإكمال عملية الشراء

سنقوم بإرسال رسالة نصية تحتوي على رمز التفعيل، الرجاء التأكد من رقم هاتفك الجوال ادناه، ثم انقر على زر "أرسل رمز التفعيل".