شاركنا تاريخ ميلادك!
تاريخ الميلاد
تاريخ الميلاد المدخل غير مكتمل يرجى ادخال تاريخ ميلاد صحيح
×
Office of Inspector General Audit Report: Final Report on Value Engineering in Fhwa's Federal-Aid Highway Program: Project Id: Mh-2007-040 by Office of Inspector General U. S. Depart - Paperback
60.90 درهم

Office of Inspector General Audit Report: Final Report on Value Engineering in Fhwa's Federal-Aid Highway Program: Project Id: Mh-2007-040 by Office of Inspector General U. S. Depart - Paperback

كن أول من يقيِّم هذا المنتج 

60.90 درهم 

  - ستوفر -60.90 درهم
الأسعار تشمل ضريبة القيمة المضافة  التفاصيل
مشمولة في الشحن مجاني على طلبات أكثر من 100.00 درهم التفاصيل
رقم ال ISBN
9781288684847
الفئات
سياسة
الكاتب
Office of Inspector General U. S. Depart
الناشر
Bibliogov
الوصف:

On March 28, we issued report on FHWA's oversight of value engineering in the Federal-aid highway program and its effectiveness. The audit objectives were to determine whether FHWA's oversight is adequate to ensure that: (1) value engineering studies are performed on all Federal-aid projects that have an estimated cost of $25 million or more; (2) value engineering studies are performed on ...

تشحن من الولايات المتحدة
اشحن الى دبي (تغيير المدينة)
التوصيل خلال الثلاثاء ١٠ يوليو - الخميس ١٢ يوليو الي دبي

حالة السلعة:
جديدة
البائع:
InternationalBookStore (88% تقييم ايجابي)

معلومات المنتج

  •  

    المواصفات

    رقم ال ISBN
    9781288684847
    الفئات
    سياسة
    الرقم المميز للسلعة
    2724354342392
    المؤلفين
    الكاتب
    Office of Inspector General U. S. Depart
    المؤلفين
    الناشر
    Bibliogov
    رقم ال ISBN
    9781288684847
    الفئات
    سياسة
    الرقم المميز للسلعة
    2724354342392
    المؤلفين
    الكاتب
    Office of Inspector General U. S. Depart
    المؤلفين
    الناشر
    Bibliogov
    معلومات تقنية
    غلاف الكتاب
    غلاف عادي
    اللغات والبلدان
    لغة الكتاب
    الانجليزية
    إقرأ المزيد
  •  

    الوصف:

    On March 28, we issued report on FHWA's oversight of value engineering in the Federal-aid highway program and its effectiveness. The audit objectives were to determine whether FHWA's oversight is adequate to ensure that: (1) value engineering studies are performed on all Federal-aid projects that

    On March 28, we issued report on FHWA's oversight of value engineering in the Federal-aid highway program and its effectiveness. The audit objectives were to determine whether FHWA's oversight is adequate to ensure that: (1) value engineering studies are performed on all Federal-aid projects that have an estimated cost of $25 million or more; (2) value engineering studies are performed on all Federal-aid projects that have a high potential for cost savings; and (3) all value engineering recommendations that can be implemented are approved, permitting the greatest degree of potential savings to be achieved. Value engineering provides a substantial opportunity for states to obtain the most value from Federal-aid funds by achieving savings on planned construction projects. Furthermore, it has the potential to serve as a key tool in FHWA's stewardship of Federal funds. Historically, states have saved an average of 5 percent of estimated project costs by performing value engineering studies and accepting recommendations. From FY 2001 through FY 2004, states collectively reported $4.2 billion in recommended savings (about $1 billion annually). During the same 4-year period, we estimate that if the states had conducted all required value engineering studies and had accepted more recommendations, they could have saved an estimated $725 million in Federal funds. Had these savings been achieved, states would have had the opportunity to start additional planned projects. To facilitate FHWA achieving this potential benefit in the future, we are recommended that FHWA revise its value engineering policy to require (1) responsible state management to sign off on the rejection of value engineering recommendations that contain substantial cost savings; (2) value engineering studies to include support of potential savings, (3) and FHWA Division Offices' value engineering coordinators to either monitor or participate in all state value engineering studies for Federal-aid projects. We also recommended that FHWA develop performance goals for measuring the effectiveness of state value engineering programs and goals for the responsible Division Office personnel, incorporate value engineering into annual internal control reviews, and collect and disseminate value engineering best practices to the states' transportation departments.

    خصائص المنتج:
    • الفئات: سياسة
    • غلاف الكتاب: غلاف عادي
    • لغة الكتاب: الانجليزية
    • الكاتب: Office of Inspector General U. S. Depart
    • الناشر: Bibliogov
    • رقم ال ISBN: 9781288684847
    • عدد الصفحات: 40
    • لأبعاد (الارتفاع*العرض*العمق): 9.69 x 7.44 x 0.08 inches
 

تقييمات المستخدمين

0
لا يوجد تقييمات بعد
كن أول من يقيِّم هذا المنتج
قيِّم هذا المنتج:

إعلانات مُموَّلة لك

×

الرجاء تأكيد رقم هاتفك الجوال لإكمال عملية الشراء

سنقوم بإرسال رسالة نصية تحتوي على رمز التفعيل، الرجاء التأكد من رقم هاتفك الجوال ادناه، ثم انقر على زر "أرسل رمز التفعيل".