شاركنا تاريخ ميلادك!
تاريخ الميلاد
تاريخ الميلاد المدخل غير مكتمل يرجى ادخال تاريخ ميلاد صحيح
×
Office of Inspector General Audit Report: Initial Assessment of the Central Artery/Tunnel Project Stem to Stern Safety Review: Project Id: Mh-2007-063 by Office of Inspector General U. S. Depart - Paperback
60.90 درهم

Office of Inspector General Audit Report: Initial Assessment of the Central Artery/Tunnel Project Stem to Stern Safety Review: Project Id: Mh-2007-063 by Office of Inspector General U. S. Depart - Paperback

كن أول من يقيِّم هذا المنتج 

60.90 درهم 

  - ستوفر -60.90 درهم
الأسعار تشمل ضريبة القيمة المضافة  التفاصيل
الشحن مجاني التفاصيل
رقم ال ISBN
9781288684717
الفئات
سياسة
الكاتب
Office of Inspector General U. S. Depart
الناشر
Bibliogov
الوصف:

On August 16, 2007, we issued our report, "Initial Assessment of the Central Artery/Tunnel Project Stem to Stern Safety Review." This assessment is part of our ongoing independent oversight as requested by the Massachusetts Congressional delegation in July 2006 and subsequently reaffirmed by the NTSB Reauthorization Act of 2006. The Stem to Stern safety review is divided into several ...

تشحن من الولايات المتحدة
اشحن الى دبي (تغيير المدينة)
التوصيل خلال السبت ٩ يونيو - الأحد ١٠ يونيو الي دبي

حالة السلعة:
جديدة
البائع:
InternationalBookStore (88% تقييم ايجابي)

معلومات المنتج

  •  

    المواصفات

    رقم ال ISBN
    9781288684717
    الفئات
    سياسة
    الرقم المميز للسلعة
    2724354341951
    المؤلفين
    الكاتب
    Office of Inspector General U. S. Depart
    المؤلفين
    الناشر
    Bibliogov
    رقم ال ISBN
    9781288684717
    الفئات
    سياسة
    الرقم المميز للسلعة
    2724354341951
    المؤلفين
    الكاتب
    Office of Inspector General U. S. Depart
    المؤلفين
    الناشر
    Bibliogov
    معلومات تقنية
    غلاف الكتاب
    غلاف عادي
    اللغات والبلدان
    لغة الكتاب
    الانجليزية
    إقرأ المزيد
  •  

    الوصف:

    On August 16, 2007, we issued our report, "Initial Assessment of the Central Artery/Tunnel Project Stem to Stern Safety Review." This assessment is part of our ongoing independent oversight as requested by the Massachusetts Congressional delegation in July 2006 and subsequently reaffirmed by the

    On August 16, 2007, we issued our report, "Initial Assessment of the Central Artery/Tunnel Project Stem to Stern Safety Review." This assessment is part of our ongoing independent oversight as requested by the Massachusetts Congressional delegation in July 2006 and subsequently reaffirmed by the NTSB Reauthorization Act of 2006. The Stem to Stern safety review is divided into several phases, with Phase I being a purposely limited and expeditious review to identify immediate risks to public safety. We evaluated whether the findings and recommendations in the Stem to Stern Safety Review's Phase I report adequately analyzed immediate risks and whether necessary remedial measures were identified. We found that Phase I of the Stem to Stern Safety Review generally analyzed the correct project components, but certain items should have been classified as higher priority safety risks in the Phase I report, or necessary follow-up activities were not sufficiently clear. We also found that the leadership, scope, and methodology for Phase II of the Stem to Stern Safety Review need to be specified and aggressive action must be taken going forward. FHWA agreed with the findings in our report and concurred with its recommendations.

    خصائص المنتج:
    • الفئات: سياسة
    • غلاف الكتاب: غلاف عادي
    • لغة الكتاب: الانجليزية
    • الكاتب: Office of Inspector General U. S. Depart
    • الناشر: Bibliogov
    • رقم ال ISBN: 9781288684717
    • عدد الصفحات: 30
    • لأبعاد (الارتفاع*العرض*العمق): 9.69 x 7.44 x 0.06 inches
 

تقييمات المستخدمين

0
لا يوجد تقييمات بعد
كن أول من يقيِّم هذا المنتج
قيِّم هذا المنتج:

إعلانات مُموَّلة لك

×

الرجاء تأكيد رقم هاتفك الجوال لإكمال عملية الشراء

سنقوم بإرسال رسالة نصية تحتوي على رمز التفعيل، الرجاء التأكد من رقم هاتفك الجوال ادناه، ثم انقر على زر "أرسل رمز التفعيل".