Office of Inspector General Audit Report: Overpayment of Premiums for the Central Artery Project's Owner Controlled Insurance Program: Project Id: Tr- by Office of Inspector General U. S. Depart - Paperback
60.90 درهم

Office of Inspector General Audit Report: Overpayment of Premiums for the Central Artery Project's Owner Controlled Insurance Program: Project Id: Tr- by Office of Inspector General U. S. Depart - Paperback

كن أول من يقيِّم هذا المنتج 

60.90 درهم 

  - ستوفر -60.90 درهم
الأسعار تشمل ضريبة القيمة المضافة  التفاصيل
رقم ال ISBN
9781288690848
الفئات
سياسة
الكاتب
Office of Inspector General U. S. Depart
الناشر
Bibliogov
الوصف:

We conducted this audit of the Central Artery project's Owner-Controlled Insurance Program (OCIP) in response to Congressional direction contained in House Committee Report number 105-648. In that report, the Committee directed the Office of Inspector General "to continue to oversee the costs, funding, and schedule of the Central Artery project and to report periodically its results to the ...

تشحن من الولايات المتحدة
اشحن الى دبي (تغيير المدينة)
التوصيل خلال السبت ٥ مايو - الأحد ٦ مايو الي دبي

حالة السلعة:
جديدة
البائع:
InternationalBookStore (88% تقييم ايجابي)

معلومات المنتج

  •  

    المواصفات

    رقم ال ISBN
    9781288690848
    الفئات
    سياسة
    الرقم المميز للسلعة
    2724354362512
    المؤلفين
    الكاتب
    Office of Inspector General U. S. Depart
    المؤلفين
    الناشر
    Bibliogov
    رقم ال ISBN
    9781288690848
    الفئات
    سياسة
    الرقم المميز للسلعة
    2724354362512
    المؤلفين
    الكاتب
    Office of Inspector General U. S. Depart
    المؤلفين
    الناشر
    Bibliogov
    معلومات تقنية
    غلاف الكتاب
    غلاف عادي
    اللغات والبلدان
    لغة الكتاب
    الانجليزية
    إقرأ المزيد
  •  

    الوصف:

    We conducted this audit of the Central Artery project's Owner-Controlled Insurance Program (OCIP) in response to Congressional direction contained in House Committee Report number 105-648. In that report, the Committee directed the Office of Inspector General "to continue to oversee the costs,

    We conducted this audit of the Central Artery project's Owner-Controlled Insurance Program (OCIP) in response to Congressional direction contained in House Committee Report number 105-648. In that report, the Committee directed the Office of Inspector General "to continue to oversee the costs, funding, and schedule of the Central Artery project and to report periodically its results to the Committee." The objective of this audit was to determine whether the workers' compensation and general liability portions of the program were effective in reducing the overall cost of insurance for the project.

    خصائص المنتج:
    • الفئات: سياسة
    • غلاف الكتاب: غلاف عادي
    • لغة الكتاب: الانجليزية
    • الكاتب: Office of Inspector General U. S. Depart
    • الناشر: Bibliogov
    • رقم ال ISBN: 9781288690848
    • عدد الصفحات: 42
    • لأبعاد (الارتفاع*العرض*العمق): 9.69 x 7.44 x 0.09 inches
 

تقييمات المستخدمين

0
لا يوجد تقييمات بعد
كن أول من يقيِّم هذا المنتج
قيِّم هذا المنتج:

إعلانات مُموَّلة لك

×

الرجاء تأكيد رقم هاتفك الجوال لإكمال عملية الشراء

سنقوم بإرسال رسالة نصية تحتوي على رمز التفعيل، الرجاء التأكد من رقم هاتفك الجوال ادناه، ثم انقر على زر "أرسل رمز التفعيل".