شاركنا تاريخ ميلادك!
تاريخ الميلاد
تاريخ الميلاد المدخل غير مكتمل يرجى ادخال تاريخ ميلاد صحيح
×
Office of Inspector General Audit Report: Review of the Hiawatha Corridor Light Rail Transit Project: Project Id: In-2002-078 by Office of Inspector General U. S. Depart - Paperback
60.90 درهم

Office of Inspector General Audit Report: Review of the Hiawatha Corridor Light Rail Transit Project: Project Id: In-2002-078 by Office of Inspector General U. S. Depart - Paperback

كن أول من يقيِّم هذا المنتج 

60.90 درهم 

  - ستوفر -60.90 درهم
الأسعار تشمل ضريبة القيمة المضافة  التفاصيل
مشمولة في الشحن مجاني على طلبات أكثر من 100.00 درهم التفاصيل
رقم ال ISBN
9781288686803
الفئات
سياسة
الكاتب
Office of Inspector General U. S. Depart
الناشر
Bibliogov
الوصف:

We publicly released our review of the status, cost, and completion schedule of the Hiawatha Corridor Light Rail Transit Project in Minneapolis, MN. We found that: The scheduled completion date of December 2004 and cost estimate of $675.5 million are reasonable. However, tunnel construction, relocation of private utilities, and post-September 11 concerns about security could affect the ...

تشحن من الولايات المتحدة
اشحن الى دبي (تغيير المدينة)
التوصيل خلال الأحد ٥ أغسطس - الثلاثاء ٧ أغسطس الي دبي

حالة السلعة:
جديدة
البائع:
InternationalBookStore (87% تقييم ايجابي)

معلومات المنتج

  •  

    المواصفات

    رقم ال ISBN
    9781288686803
    الفئات
    سياسة
    الرقم المميز للسلعة
    2724354349544
    المؤلفين
    الكاتب
    Office of Inspector General U. S. Depart
    المؤلفين
    الناشر
    Bibliogov
    رقم ال ISBN
    9781288686803
    الفئات
    سياسة
    الرقم المميز للسلعة
    2724354349544
    المؤلفين
    الكاتب
    Office of Inspector General U. S. Depart
    المؤلفين
    الناشر
    Bibliogov
    معلومات تقنية
    غلاف الكتاب
    غلاف عادي
    اللغات والبلدان
    لغة الكتاب
    الانجليزية
    إقرأ المزيد
  •  

    الوصف:

    We publicly released our review of the status, cost, and completion schedule of the Hiawatha Corridor Light Rail Transit Project in Minneapolis, MN. We found that: The scheduled completion date of December 2004 and cost estimate of $675.5 million are reasonable. However, tunnel construction,

    We publicly released our review of the status, cost, and completion schedule of the Hiawatha Corridor Light Rail Transit Project in Minneapolis, MN. We found that: The scheduled completion date of December 2004 and cost estimate of $675.5 million are reasonable. However, tunnel construction, relocation of private utilities, and post-September 11 concerns about security could affect the project's schedule and costs. The project may encounter temporary cash flow shortfalls because costs are expected to exceed reimbursements during construction. In response to a recommendation in our June 2001 draft report, the sponsor's governing board adopted a cash flow management plan for the project.

    خصائص المنتج:
    • الفئات: سياسة
    • غلاف الكتاب: غلاف عادي
    • لغة الكتاب: الانجليزية
    • الكاتب: Office of Inspector General U. S. Depart
    • الناشر: Bibliogov
    • رقم ال ISBN: 9781288686803
    • عدد الصفحات: 28
    • لأبعاد (الارتفاع*العرض*العمق): 9.69 x 7.44 x 0.06 inches
 

تقييمات المستخدمين

0
لا يوجد تقييمات بعد
كن أول من يقيِّم هذا المنتج
قيِّم هذا المنتج:

إعلانات مُموَّلة لك

×

الرجاء تأكيد رقم هاتفك الجوال لإكمال عملية الشراء

سنقوم بإرسال رسالة نصية تحتوي على رمز التفعيل، الرجاء التأكد من رقم هاتفك الجوال ادناه، ثم انقر على زر "أرسل رمز التفعيل".