شاركنا تاريخ ميلادك!
تاريخ الميلاد
تاريخ الميلاد المدخل غير مكتمل يرجى ادخال تاريخ ميلاد صحيح
×
Quality Assurance: Concerns about Four Navy Missile Systems: Nsiad-88-104 by U. S. Government Accountability Office ( - Paperback
140.10 درهم

Quality Assurance: Concerns about Four Navy Missile Systems: Nsiad-88-104 by U. S. Government Accountability Office ( - Paperback

كن أول من يقيِّم هذا المنتج 

140.10 درهم 

  - ستوفر -140.10 درهم
الأسعار تشمل ضريبة القيمة المضافة  التفاصيل
الشحن مجاني التفاصيل
رقم ال ISBN
9781287198703
الفئات
سياسة
الكاتب
U. S. Government Accountability Office (
الناشر
Bibliogov
الوصف:

In response to a congressional request, GAO reviewed quality assurance problems on four missile systems, the Phoenix, the Harpoon, the Sparrow, and the High-Speed Anti-Radiation (HARM) missiles, to determine the causes and potential effects of the problems. GAO found that: (1) all the missiles it examined had defects, since they did not completely conform to contract specifications; (2) ...

تشحن من الولايات المتحدة
اشحن الى دبي (تغيير المدينة)
التوصيل خلال السبت ٩ يونيو - الأحد ١٠ يونيو الي دبي

حالة السلعة:
جديدة
البائع:
InternationalBookStore (88% تقييم ايجابي)

معلومات المنتج

  •  

    المواصفات

    رقم ال ISBN
    9781287198703
    الفئات
    سياسة
    الرقم المميز للسلعة
    2724352643071
    المؤلفين
    الكاتب
    U. S. Government Accountability Office (
    المؤلفين
    الناشر
    Bibliogov
    رقم ال ISBN
    9781287198703
    الفئات
    سياسة
    الرقم المميز للسلعة
    2724352643071
    المؤلفين
    الكاتب
    U. S. Government Accountability Office (
    المؤلفين
    الناشر
    Bibliogov
    معلومات تقنية
    غلاف الكتاب
    غلاف عادي
    اللغات والبلدان
    لغة الكتاب
    الانجليزية
    إقرأ المزيد
  •  

    الوصف:

    In response to a congressional request, GAO reviewed quality assurance problems on four missile systems, the Phoenix, the Harpoon, the Sparrow, and the High-Speed Anti-Radiation (HARM) missiles, to determine the causes and potential effects of the problems. GAO found that: (1) all the missiles it

    In response to a congressional request, GAO reviewed quality assurance problems on four missile systems, the Phoenix, the Harpoon, the Sparrow, and the High-Speed Anti-Radiation (HARM) missiles, to determine the causes and potential effects of the problems. GAO found that: (1) all the missiles it examined had defects, since they did not completely conform to contract specifications; (2) some defects occurred because of the prime contractor's inadequate manufacturing processes, but subcontractors' poor manufacturing and inadequate quality oversight caused more significant problems; and (3) contractors believed that many of the reported manufacturing defects in soldering were due to the Navy's stringent soldering specifications. GAO believes that the Navy should have: (1) tighter controls over subcontractor production; (2) better reporting of changes in manufacturing processes; and (3) its prime contractors inspect and test subcontractor-manufactured items.

    خصائص المنتج:
    • الفئات: سياسة
    • غلاف الكتاب: غلاف عادي
    • لغة الكتاب: الانجليزية
    • الكاتب: U. S. Government Accountability Office (
    • الناشر: Bibliogov
    • رقم ال ISBN: 9781287198703
    • عدد الصفحات: 114
    • لأبعاد (الارتفاع*العرض*العمق): 9.69 x 7.44 x 0.24 inches
 

تقييمات المستخدمين

0
لا يوجد تقييمات بعد
كن أول من يقيِّم هذا المنتج
قيِّم هذا المنتج:

إعلانات مُموَّلة لك

×

الرجاء تأكيد رقم هاتفك الجوال لإكمال عملية الشراء

سنقوم بإرسال رسالة نصية تحتوي على رمز التفعيل، الرجاء التأكد من رقم هاتفك الجوال ادناه، ثم انقر على زر "أرسل رمز التفعيل".